Hull Energy Production Facility: Difference between revisions
add page specific text |
No edit summary |
||
| Line 7: | Line 7: | ||
==Plant== | ==Plant== | ||
The plant is based on a [[gasification]] technology via a [[ | The plant is based on a [[gasification]] technology via a [[Fluidised Bed]] with power generation via a steam [[boiler]] and [[turbine]] designed to process up to 86,400 tonnes per annum at a nominal capacity of 10.8 tonnes per hour. The plant remainder closed much of 2021 to allow for an upgrade programme and operated at 15% of capacity in the year<ref>Annual Report</ref>. | ||
{{BioSustain|EPR={{#var: epr}}}} | {{BioSustain|EPR={{#var: epr}}}} | ||