Hull Energy Production Facility: Difference between revisions

Bin52 (talk | contribs)
No edit summary
Bin52 (talk | contribs)
news item
 
Line 4: Line 4:


==Summary==
==Summary==
Also known as Biomass UK No 1, [[Hull Energy Production Facility]] is a [[Biomass EfW]] facility based on [[Wood Waste]] designed to export 10MWe of power<ref>Annual Report 2021</ref>. The plant was developed by [[Aviva Investors]] who also developed Biomass UK No 2 ([[Barry Dock – Biomass No 2|Barry Dock]]) and No3 ([[Boston Energy Production Facility]]) <ref>https://www.letsrecycle.com/news/boston-biomass-approved-nrw-consults-barry/</ref>.  
Also known as Biomass UK No 1, [[Hull Energy Production Facility]] is a [[Biomass EfW]] facility based on [[Wood Waste]] designed to export 10MWe of power<ref>Annual Report 2021</ref>. The plant was developed by [[Aviva Investors]] who also developed Biomass UK No 2 ([[Barry Dock – Biomass No 2|Barry Dock]]) and No3 ([[Boston Energy Production Facility]]) <ref>https://www.letsrecycle.com/news/boston-biomass-approved-nrw-consults-barry/</ref>. This plant and the other two were reported in November 2024 as being close to being mothballed [https://www.mrw.co.uk/news/aviva-to-pull-plug-on-three-failed-efws-28-11-2024/]


==Plant==
==Plant==