Thameside Energy Recovery Facility: Difference between revisions
mNo edit summary |
mNo edit summary |
||
| Line 17: | Line 17: | ||
==Technology== | ==Technology== | ||
The plant technology will comprise standard moving [[grate]] technology. | The plant technology will comprise standard moving [[grate]] technology. It was reported in January 2023 that the permit application varies the technology to a inclined moving [[grate]] with a throughput capacity of 43.3 tonnes per hour <ref>https://www.letsrecycle.com/news/viridor-applies-to-double-thameside-efw-capacity/</ref>. | ||
==Construction== | ==Construction== | ||