Dudley EfW: Difference between revisions

No edit summary
No edit summary
Line 1: Line 1:
{{#vardefine: epr|HP3247QS}}
{{#vardefine: epr|HP3247QS}}
{{#vardefine: eprold|AP3435SD}}
[[Category:EfW Plants]]
[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Dudley has permitted operational capacity of 105,000 tonnes per annum.
An [[EfW]] facility based upon conventional [[combustion]] technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Dudley has permitted operational capacity of 105,000 tonnes per annum.
Line 15: Line 16:
The plant comprises two lines via standard [[combustion]] [[CNIM]] boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 6 tonnes per hour or up to 99,000 tonnes per annum and generating 7 MWe.
The plant comprises two lines via standard [[combustion]] [[CNIM]] boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 6 tonnes per hour or up to 99,000 tonnes per annum and generating 7 MWe.


{{EfWLAData|EPR={{#var: epr}}}}
{{EfWLAData|EPR={{#var: eprold}}}}
{{EAIn|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: eprold}}}}
==References==
==References==
<references />
<references />