Slough Multifuel EFW: Difference between revisions
add page specific text |
No edit summary |
||
Line 1: | Line 1: | ||
{{#vardefine:epr|KP3702MY}}[[Category:EfW Plants]] | {{#vardefine:epr|KP3702MY}}[[Category:EfW Plants]] | ||
An [[EfW]] facility based upon conventional [[combustion]] technology that completed construction and handover in August 2024. [[Slough Multifuel EFW]] was granted [[Planning Permission|planning permission]] in 2017 and has a permitted capacity of 480,000 tonnes per annum.{{EfWTemplate|EPR={{#var:epr}}|id=75}}[[File:Slough-mf.png|350px|left|Slough Multifuel | An [[EfW]] facility based upon conventional [[combustion]] technology that completed construction and handover in August 2024<ref>[https://www.kanadevia-inova.com/hitachi-zosen-inova-hands-new-slough-multifuel-facility-to-sse-and-copenhagen-infrastructure-partners/ HZI Website News Article Aug'24]. [[Slough Multifuel EFW]] was granted [[Planning Permission|planning permission]] in 2017 and has a permitted capacity of 480,000 tonnes per annum.{{EfWTemplate|EPR={{#var:epr}}|id=75}}[[File:Slough-mf.png|350px|left|Slough Multifuel Image from HZI website, all rights reserved]]__TOC__<br clear='left'/> | ||
==Summary== | ==Summary== |
Revision as of 12:28, 4 October 2024
An EfW facility based upon conventional combustion technology that completed construction and handover in August 2024Cite error: Closing </ref>
missing for <ref>
tag.
The plant is located on the Slough Trading Estate, close to the Slough Heat & Power facility, which is based on biomass feedstock.
Technology
The plant technology comprises standard moving grate technology, producing super-heated steam with an operational capacity of 545,000 tonnes per annum, generating 50MWe [1].
Construction
The plant gained planning permission in 2017, and was delivered by an EPC turnkey arrangement with Hitachi Zosen Inova technology. Construction was reported completed in August 2024[2].
Waste Input
The plant is intended to run on waste derived fuel from residual Household Waste and Commercial Waste, with around two thirds identified for long term contract.
References
- ↑ January 2021 Newsletter
- ↑ Hitachi Zosen Inova Press Release