Thameside Energy Recovery Facility: Difference between revisions
m Bin52 moved page Tilbury Docks - Phase 2 (EfW) to Thameside Energy Recovery Facility: rebrand by owner |
No edit summary |
||
| Line 1: | Line 1: | ||
{{#vardefine:epr|Tbc36}}[[Category:EfW Plants]] | {{#vardefine:epr|Tbc36}}[[Category:EfW Plants]] | ||
Originally named [[Tilbury Docks - Phase 2 (EfW)]] this [[EfW]] facility is based upon conventional [[combustion]] technology that is the second phase of a development that also comprised a [[Biomass Waste EFW]] facility - listed on WikiWaste as [[Tilbury Green Power]]. The second phase of the site is anticipated to process 350,000 tonnes per annum of [[residual waste]] and reached financial close in November 2024<ref>[https://lakesideefw.co.uk/news-and-insights/viridor-reaches-financial-close-on-thameside-energy-recovery-facility-at-tilbury-docks/ Viridor News Item]</ref> and has been 'renamed' Thameside Energy Recovery Facility | Originally named [[Tilbury Docks - Phase 2 (EfW)]] this [[EfW]] facility is based upon conventional [[combustion]] technology that is the second phase of a development that also comprised a [[Biomass Waste EFW]] facility - listed on WikiWaste as [[Tilbury Green Power]]. The second phase of the site is anticipated to process 350,000 tonnes per annum of [[residual waste]] and reached financial close in November 2024<ref>[https://lakesideefw.co.uk/news-and-insights/viridor-reaches-financial-close-on-thameside-energy-recovery-facility-at-tilbury-docks/ Viridor News Item]</ref> and has been 'renamed' '''Thameside Energy Recovery Facility''' | ||
{{EfWTemplate|EPR={{#var:epr}}|id=139}} | {{EfWTemplate|EPR={{#var:epr}}|id=139}} | ||