Biodegradable Municipal Waste: Difference between revisions
m add graph |
m Minor changes |
||
Line 1: | Line 1: | ||
[[Category:Tonnage & Waste Types]][[Category:Legislation & Policy]] | [[Category:Tonnage & Waste Types]][[Category:Legislation & Policy]] | ||
== Overview == | == Overview == | ||
The biodegradable fraction of [[Municipal Solid Waste]] (generally around 50% by weight of [[MSW]]) is important as the UK has legally binding EU targets to deliver set reductions of [[BMW]] waste to landfill, which were originally addressed through individual targets on local authorities. These have now been lifted in England – placing a reliance primarily on the [[Landfill Tax]] and treatment systems | The biodegradable fraction of [[Municipal Solid Waste]] (generally around 50% by weight of [[MSW]]) is important as the UK has legally binding EU targets to deliver set reductions of [[BMW]] waste to landfill, which were originally addressed through individual targets on local authorities. These have now been lifted in England – placing a reliance primarily on the [[Landfill Tax]] and treatment systems under [[PFI]] funded schemes to deliver the objectives. | ||
== Targets == | == Targets == | ||
The targets outlined below (and which the UK is expected to meet), come from European Directive 1999/31/EC on the landfill of waste. | |||
The amount of BMW to landfill as a target is measured against the 1995 baseline requiring: | The amount of BMW to landfill as a target is measured against the 1995 baseline requiring: | ||
* No greater than 75% of the 1995 baseline by 2010 | * No greater than 75% of the 1995 baseline by 2010 |
Revision as of 13:42, 19 November 2019
Overview
The biodegradable fraction of Municipal Solid Waste (generally around 50% by weight of MSW) is important as the UK has legally binding EU targets to deliver set reductions of BMW waste to landfill, which were originally addressed through individual targets on local authorities. These have now been lifted in England – placing a reliance primarily on the Landfill Tax and treatment systems under PFI funded schemes to deliver the objectives.
Targets
The targets outlined below (and which the UK is expected to meet), come from European Directive 1999/31/EC on the landfill of waste.
The amount of BMW to landfill as a target is measured against the 1995 baseline requiring:
- No greater than 75% of the 1995 baseline by 2010
- No greater than 50% of the 1995 baseline by 2013
- No greater than 35% of the 1995 baseline by 2020
and has progressively reduced year on year with 7.4 million tonnes sent to Landfill in 2017, representing 21% of the 1995 baseline value [1]