The formula for calculating the [[R1]] status is given below: | The formula for calculating the [[R1]] status is given below: | ||
<big>Pl ef = <math>{O_{exp}-(E_f+E_{imp})} \over {(E_f+E_{imp}+E_{circ})} </math></big> | |||
all figures as equivalents in accordance to BREF,Chapter 3.5.6 | all figures as equivalents in accordance to BREF,Chapter 3.5.6 | ||
| Line 21: | Line 21: | ||
''"If the result is higher than 1: This shows that the plant minus imported energy with steam production is exporting (BREF) or producing (ECJ C-228/00) more energy than that which is required to operate the total waste incineration process."''<ref name="foo" /> | ''"If the result is higher than 1: This shows that the plant minus imported energy with steam production is exporting (BREF) or producing (ECJ C-228/00) more energy than that which is required to operate the total waste incineration process."''<ref name="foo" /> | ||