Incineration with Energy Recovery: Difference between revisions
mNo edit summary |
Addition of Efficiency |
||
Line 4: | Line 4: | ||
[[Waste Disposal Authorities]] will select this option from a drop down list within [[WasteDataFlow]] if the [[Residual Waste]] collected by the [[Waste Collection Authority|Waste Collection Authorities]] or [[Residual Waste]] collected at the [[Household Waste Recycling Centres]] has been sent to an incineration facility that uses the waste to recovery energy such as an [[Energy Recovery Facility]] or an [[Energy from Waste]] (EfW) facility. | [[Waste Disposal Authorities]] will select this option from a drop down list within [[WasteDataFlow]] if the [[Residual Waste]] collected by the [[Waste Collection Authority|Waste Collection Authorities]] or [[Residual Waste]] collected at the [[Household Waste Recycling Centres]] has been sent to an incineration facility that uses the waste to recovery energy such as an [[Energy Recovery Facility]] or an [[Energy from Waste]] (EfW) facility. | ||
==Efficiency== | |||
Where an EFW facility meets the standards of efficiency set out in the European Commission Guidelines on the [[R1]] energy efficiency formula in Annex II of Directive 2008/98/EC, it can be considered an [[Energy Recovery Facility]] or [[R1]] facility ([[Incineration with Energy Recovery]]) and to achieve this a plant may need [[CHP]] as part of its solution. |
Revision as of 12:31, 3 February 2021
This is a ‘waste destination’ description that appears in WasteDataFlow.
Waste Disposal Authorities will select this option from a drop down list within WasteDataFlow if the Residual Waste collected by the Waste Collection Authorities or Residual Waste collected at the Household Waste Recycling Centres has been sent to an incineration facility that uses the waste to recovery energy such as an Energy Recovery Facility or an Energy from Waste (EfW) facility.
Efficiency
Where an EFW facility meets the standards of efficiency set out in the European Commission Guidelines on the R1 energy efficiency formula in Annex II of Directive 2008/98/EC, it can be considered an Energy Recovery Facility or R1 facility (Incineration with Energy Recovery) and to achieve this a plant may need CHP as part of its solution.