Biomass Waste EFW: Difference between revisions
Added sewage sludge and wood waste link |
Typo |
||
| Line 5: | Line 5: | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
! Waste !! Overview !! Tonnage (mt) '16-'17 !! Power Generated (GWh) '16-'17 | ! Waste !! Overview !! Tonnage (mt) '16-'17 !! Power Generated (GWh) '16-'17 | ||
|- | |- | ||
| [[Wood Waste]] || Defined by the Wood Recycling Association Grading structure of A-C Wood tonnage fluctuates marginally throughout the year with the highest tonnages available during the summer months. The tonnage of wood is also heavily influenced by the level of activity in the construction sector although other sources are commercial packaging and wood delivered to household recycling sites. As of Qtr 1 2019 there are currently 23 waste wood facilities operating in the UK with another 3 taking a combination of waste wood and virgin wood and one a mixture of wood and MBM; 7 facilities are currently under construction. || 1.63 || 1273 | | [[Wood Waste]] || Defined by the Wood Recycling Association Grading structure of A-C Wood tonnage fluctuates marginally throughout the year with the highest tonnages available during the summer months. The tonnage of wood is also heavily influenced by the level of activity in the construction sector although other sources are commercial packaging and wood delivered to household recycling sites. As of Qtr 1 2019 there are currently 23 waste wood facilities operating in the UK with another 3 taking a combination of waste wood and virgin wood and one a mixture of wood and MBM; 7 facilities are currently under construction. || 1.63 || 1273 | ||