Private Finance Initiative: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m expanded text
Bin52 (talk | contribs)
m expanded text
Line 110: Line 110:
| Peterborough || [[Fourth Drove, Fengate]] || [[PPP]] || Operational || 85 || [[EfW]] || [[Viridor]] site
| Peterborough || [[Fourth Drove, Fengate]] || [[PPP]] || Operational || 85 || [[EfW]] || [[Viridor]] site
|-
|-
| Example || Example || Example || Example || Example || Example || Example
| Portsmouth || [[Portsmouth Project Integra]] || [[PPP]] || Operational || 198 || [[EfW]] || [[Veolia]] site delivered primarily for [[Hampshire County Council]]
|-
|-
| Example || Example || Example || Example || Example || Example || Example
| Rugby || [[Malpass Farm]] || [[PPP]] || Operational || 200 || [[MBT]] || Example
|-
|-
| Example || Example || Example || Example || Example || Example || Example
| Sheffield || [[Bernard Road]] || [[PPP]] || Operational || 207 || [[EfW]] || Was part of wider [[Veolia]] contract, now [[EfW]] plant has been separated out
|-
|-
| Example || Example || Example || Example || Example || Example || Example
| Shropshire || [[Battlefield Enterprise Park]] || [[PFI]] || Operational || 90 || [[EfW]] || Example
|-
|-
| Example || Example || Example || Example || Example || Example || Example
| S.E. London || [[SELCHP]] || [[PPP]] || Operational || 431 || [[EfW]] || [[Veolia]] site
|-
|-
| Example || Example || Example || Example || Example || Example || Example
| S. London || [[Beddington Lane]]|| [[PPP]] || Operational<ref name="op" /> ||300 || [[EfW]] || [[Viridor]] site
|-
|-
| Example || Example || Example || Example || Example || Example || Example
| South Tyne & Wear || [[Teeside Lines 4&5]] || [[PFI]] || Operational || 256 || [[EfW]] || Example
|-
|-
| Example || Example || Example || Example || Example || Example || Example
| South Devon || [[Devonport]] || [[PFI]] || Operational || 245 || [[EfW]] || Am [[MVV]] project
|-
|-
| Example || Example || Example || Example || Example || Example || Example
| South Yorkshire || [[Bolton Road, Manvers]] || [[PFI]] ||Operational || 286 || [[MBT]] || Example
|-
|-
| Example || Example || Example || Example || Example || Example || Example
| Southampton || [[Marchwood Project Integra]] || [[PPP]] || Operational || 198 || [[EfW]] || [[Veolia]] site
|-
|-
| Example || Example || Example || Example || Example || Example || Example
| Example || Example || Example || Example || Example || Example || Example

Revision as of 16:17, 21 January 2020

In its desire to stimulate investment in waste infrastructure, and underpin the diversion of BMW waste from Landfill, the Government supported/subsidized a range of treatment technologies on a number of sites that were procured by Waste Disposal Authorities needing this infrastructure through a dedicated long term Private Finance Initiative (PFI). This arrangement has now ceased, several schemes which were to have been funded had their funding removed after DEFRA assessed [1] that the BMW targets could be met with the infrastructure funded to that date, and several are currently being considered by Waste Disposal Authorities for movement out of PFI after consideration of the cost benefit of continuing with the contract.

The table below is an extract from DEFRA data [2] summarizing the residual waste projects that are/were PFI and PPP projects:

Location Project/Site Classification Status Capacity [3] (ktpa) Plant Type Comment
Avonmouth New Earth Solutions PPP Operational 372 MBT Bought out of administration by Beauparc,currently services West of England, contracts lost to Suez and Viridor from 2022
Avonmouth New Earth Energy PPP Mothballed[4] 73 EfW RDF from Avonmouth MBT fed this plant, technology failed, currently mothballed
Basingstoke Chineham (Project Integra) PPP Operational 99 EfW Veolia site for Hampshire County Council
Birmingham Landor Street PPP Operational 165 MBT Example
Birmingham Tyseley PPP Operational 361 EfW Veolia site towards its end of life
Bolton Raikes Lane PFI Operational 86 EfW Example
Buckinghamshire Greatmoor PPP Operational 300 EfW FCC site
Cambridgeshire Waterbeach PFI Operational[5] 200 MBT Amey Cespa site with variable performance reported, planning being pursued for new EfW on the site
Cornwall St. Dennis PFI Operational 240 EfW Suez site
Coventry Coventry EFW PPP Operational 245 EfW Example
Cumbria Hespin Wood PPP Mothballed[4] 66 MBT Example
Cumbria Barrow-in-Furness PPP Mothballed 50 MBT Example
Derbyshire Sinfin Lane PPP In Construction 190 EfW Recent termination of contract after delays in commissioning
Dudley Lister Road PPP Operational 93 EfW Example
ELWA 1 Frog Island PFI Operational 180 MBT Renewi site servicing ELWA, recently reported financial difficulty
ELWA 2 Jenkins Lane PFI Operational 180 MBT As per ELWA 1
East Sussex Newhaven PFI Operational 234 EfW Servicing East Sussex County Council and Brighton and Hove City Council
Essex Courtauld Road PFI Operational[5] 417 MBT Servicing Essex County Council and Southend-on-Sea Council, reported operational difficulties
Exeter Marsh Barton PPP Operational 60 EfW Viridor site
Ferrybridge Multifuel 1 (FM1) PPP Operational 400 EfW Example
Gloucestershire Javelin Park PPP Operational[5] 190 EfW Example
Greater Manchester Longley Lane PFI Mothballed[4] 110 MBT Example
Greater Manchester Runcorn Phase 1 PFI Operational 325 EfW Example
Greater Manchester N. Manchester PFI Mothballed[4] 65 MBT Example
Greater Manchester Oldham PFI Mothballed[4] 99 MBT Example
Greater Manchester Salford PFI Mothballed[4] 73 MBT Example
Greater Manchester Stockport PFI Mothballed[4] 92 MBT Example
Hartlepool Tees Valley Lines 1 &2 PPP Operational 345 EfW Example
Herefordshire Hartlebury PPP In Construction 200 EfW Example
Hertfordshire Hoddesdon PPP Post Close 320 EfW Example
Isle of Wight Isle of Wight Gasification PPP In Construction 40 EfW Example
Isle of Wight Isle of Wight WM Project PPP Operational 80 MBT Example
Kent Allington PPP Operational 427 EfW FCC site servicing Kent County Council
Kirklees Vine Street PFI Operational 127 EfW Example
Colnbrook Lakeside PPP Operational 436 EfW Viridor and Grundon Joint Venture which will require moving to accommodate Heathrow 3rd runway
Leeds Cross Green PFI Operational 165 EfW Veolia site
Leicstershire Mowmacre Hill PFI Operational 165 EfW Example
Leicstershire Cotesbach PPP Operational 50 MBT Example
Lincolnshire North Hykeham PPP Operational 154 EfW Example
L.B. Southwark Old Kent Road PFI Operational 100 MBT Example
Merseyside Wilton PPP Operational[5] 440 EfW Suez site in Teeside, waste hauled by rail from Merseyside transfer station
Milton Keynes Wolverton PPP In Construction]] 80 EfW Example
NE Lincolnshire Stallingborough PPP Operational 53 EfW Example
Newcastle Byker/Ellington PPP Operational 187 [MBT]] Example
North London Edmonton PPP Operational 512 EfW NLWA site, currently going through planning process to be replaced as at end of life
North Somerset BOOMECO Avonmouth PPP Operational 50 MBT Bought by Veolia out of administration, serviced North Somerset Council but based in Avonmouth Docks, RDF export focused
North Yorkshire Allerton PPP Operational[5] 320 EfW Example
Nottingham Eastcroft 3rd Line PPP Consented 140 EfW Example
Nottingham Eastcroft PPP Operational 158 EfW Example
Oxfordshire Ardley PPP Operational 300 EfW Viridor site
Peterborough Fourth Drove, Fengate PPP Operational 85 EfW Viridor site
Portsmouth Portsmouth Project Integra PPP Operational 198 EfW Veolia site delivered primarily for Hampshire County Council
Rugby Malpass Farm PPP Operational 200 MBT Example
Sheffield Bernard Road PPP Operational 207 EfW Was part of wider Veolia contract, now EfW plant has been separated out
Shropshire Battlefield Enterprise Park PFI Operational 90 EfW Example
S.E. London SELCHP PPP Operational 431 EfW Veolia site
S. London Beddington Lane PPP Operational[5] 300 EfW Viridor site
South Tyne & Wear Teeside Lines 4&5 PFI Operational 256 EfW Example
South Devon Devonport PFI Operational 245 EfW Am MVV project
South Yorkshire Bolton Road, Manvers PFI Operational 286 MBT Example
Southampton Marchwood Project Integra PPP Operational 198 EfW Veolia site
Example Example Example Example Example Example Example
Example Example Example Example Example Example Example
Example Example Example Example Example Example Example
Example Example Example Example Example Example Example
Example Example Example Example Example Example Example
Example Example Example Example Example Example Example
Example Example Example Example Example Example Example
Example Example Example Example Example Example Example
Example Example Example Example Example Example Example
Example Example Example Example Example Example Example
Example Example Example Example Example Example Example
Example Example Example Example Example Example Example

References

  1. DEFRA Waste Infrastructure Delivery Programme
  2. DEFRA Residual Waste Treatment Infrastructure Project List dated 31st December 2016 but noted as last updated 29th March 2019 (edited with press updates)
  3. the capacity has been reproduced from the DEFRA data, but has not been verified in this table, an din some cases is known to be incorrect
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 In original data site was listed as operational this has been changed to Mothballed.
  5. 5.0 5.1 5.2 5.3 5.4 5.5 In original data site was listed as In Construction this has been changed to Operational.