Coatbridge Renewable Energy Facility: Difference between revisions
Imported from text file |
add page specific text |
||
| Line 1: | Line 1: | ||
[[File:Coatbridge.png|400px|left|Elevation of Coatbridge MRF and EfW Facility from their website]] | |||
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]] | [[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]] | ||
{{EfWTemplate|EPR=Tbc#13|id=60}} | {{EfWTemplate|EPR=Tbc#13|id=60}} | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon [[Gasification]] technology. Shore Energy envisaged an [[RDF]] production facility adjacent to the [[EfW]] facility on the site. | |||
== | ==Technology== | ||
The plant was based on [[Chinook]]'s [[RODECS]] [[Gasification]] technology | |||
== | ==Construction== | ||
There is no information on the current status of funding or construction of the project in the public domain, with the most recent project news requesting residual waste for the opening of the plant from 2017, posted in 2015<ref>[http://www.shore-energy.co.uk/ Shore Energy Website]</ref> | |||
== | ==Waste Input== | ||
The overall facility was designed to run on 160,000 tonnes per annum, with [[EfW]] facility designed to run on [[RDF]] and [[SRF]] delivered as prepared fuel, or prepared in the adjacent fuel processing facility. | |||
==References== | ==References== | ||
<references /> | <references /> | ||