[[File:Enviroparks.png|350px|left|Cross section of EFW Plant from Planning Documents]] | |||
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]] | [[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]] | ||
{{EfWTemplate|EPR=Tbc#07|id=53}} | {{EfWTemplate|EPR=Tbc#07|id=53}} | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon [[Gasification]] technology. Enviroparks envisaged a range of technologies on their 20 acre site, and started by building the first phase, an [[RDF]] production facility in June 2015. Other developments were delayed and a new planning application was submitted and approved in late 2017 for a revised [[EfW]] proposal. [[Zues Renewables]] have been an investment partner in the project. | |||
== | ==Technology== | ||
The plant is a 3 line, grate based technology by [[Biomass Power Limited]], generating steam to turbines delivering 86,724 MWe hours/year, or around 11MWe<ref>[https://enviroparks.co.uk/symphony/extension/richtext_redactor/getfile/?name=22c90d47ba9c2e54c3af26852d36e697.pdf Non-Technical Planning Summary]</ref>. | |||
== | ==Construction== | ||
There is no information on the current status of funding or construction of the project in the public domain. | |||
== | ==Waste Input== | ||
The plant is designed to run on 83,000 tonnes per annum of prepared [[RDF]] from offsite sources, and 155,0000 tonnes per annum of residual [[Household Waste]] and [[Commercial Waste]] prepared into an [[RDF]] in the adjacent fuel processing facility. | |||