Kemsley K3 EfW: Difference between revisions
Imported from text file |
add page specific text |
||
| Line 1: | Line 1: | ||
[[File:K3.png|300px|left|Image of Kemsley 3 EFW]] | |||
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]] | [[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]] | ||
{{EfWTemplate|EPR=Tbc#05|id=49}} | {{EfWTemplate|EPR=Tbc#05|id=49}} | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and presently in late stage construction. Kemsley (K3) has a current forecast operational capacity of 550,000 tonnes per annum with plans to extend (see plant section below). The project has been developed and will be operated by [[Wheelabrator]] and was funded by the [[Green Investment Bank]], [[BTMU]], [[Natixis]] and [[Investec]] at financial close in September 2016 for GBP £340m<ref>[https://www.wtikemsley.co.uk/site/assets/files/1315/wheelabrator_news_release_-_kemsley_financial_close_-_28_july_2016_-_uk_final.pdf Wheelabrator Press Release]</ref>.. | |||
== | ==Technology== | ||
The plant technology will comprise 2 lines of a standard moving grate technology, producing super-heated steam and 49.9MW of electricity to grid and steam to the adjacent [[DS Smith]] papermill. | |||
Additional permitted capacity is being sought within the boundaries of the current consent and technology, through improved efficiency of the plant design, to process a further 107,000 tones per annum and generate an additional 25.1MW. | |||
== | As part of the application to extend the existing capacity, in October 2019, an additional application was made for a further plant, adjacent to Kemsley (K3), called Wheelabrator Kemsley North ([[Wheelabrator Kemsley North|WKN]]). If consented it will deliver a single line of standard moving grate technology, producing super-heated steam and 42MWe from 390,0000 tonnes per annum of [[residual waste]]. | ||
Both the K3 and [[Wheelabrator Kemsley North|WKN]] facilities are discrete, and in addition to a planned 'K4' gas-fired [[CHP]] facility on the same site. The combined capacity of 'K3', 'K3 extension', and [[Wheelabrator Kemsley North|WKN]] totals 1,047,000 tonnes per annum. | |||
==Construction== | |||
The plant gained planning consent in 2012, reached financial close in July 2016, and will delivered by an [[EPC]] turnkey arrangement with [[CNIM]]. An operational date is programmed for mid 2020 <ref>[https://www.wtikemsley.co.uk/projects/project-overview/ Wheelabrator Website]</ref>. | |||
==Waste Input== | |||
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]] sourced by [[Wheelabrator]]. | |||
==References== | ==References== | ||
<references /> | <references /> | ||