==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. Lostock has a forecast operational capacity of 600,000 tonnes per annum. The project is owned by a joint venture between [[Copenhagen Infrastructure Partners]] (60%) and [[FCC Environment]] (40%) with the original developer [[Tata Steel]] 'remaining a participant'. | |||
== | ==Technology== | ||
The plant technology will comprise 2 lines of a standard moving grate technology, producing super-heated steam and 60MWe<ref>[https://www.fccenvironment.co.uk/green-energy/lostock-power/ FCC Environment Website]</ref> | |||
== | ==Construction== | ||
The plant gained planning consent in 2012, reached financial close in March 2019, and will delivered by an [[EPC]] turnkey arrangement with [[CNIM]]. An operational date is programmed for Q2 2023<ref>[https://www.letsrecycle.com/news/latest-news/fcc-strikes-deal-tata-chemicals/ Lets Recycle Article]</ref>. | |||
== | ==Waste Input== | ||
The plant is intended to run on residual [[Household Waste]] and [[Commercial Waste]] provided by [[FCC Environment]]. | |||
==References== | ==References== | ||
<references /> | <references /> |
Revision as of 10:24, 17 February 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon conventional combustion technology and presently in early stage construction. Lostock has a forecast operational capacity of 600,000 tonnes per annum. The project is owned by a joint venture between Copenhagen Infrastructure Partners (60%) and FCC Environment (40%) with the original developer Tata Steel 'remaining a participant'.
Technology
The plant technology will comprise 2 lines of a standard moving grate technology, producing super-heated steam and 60MWe[1]
Construction
The plant gained planning consent in 2012, reached financial close in March 2019, and will delivered by an EPC turnkey arrangement with CNIM. An operational date is programmed for Q2 2023[2].
Waste Input
The plant is intended to run on residual Household Waste and Commercial Waste provided by FCC Environment.