Trident Park (Cardiff ERF): Difference between revisions

Bin52 (talk | contribs)
m expanded text
Bin52 (talk | contribs)
m add page specific text
Line 20: Line 20:
==Plant==
==Plant==
Built by [[CNIM]] and [[Lagan]] which started in Spring 2012 and was delivered in 2014<ref>[https://laganscg.com/news/lagan-construction-is-awarded-50-million-energy-from-waste-contract-in-cardiff Lagan Website]</ref> at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £206m capital cost.
Built by [[CNIM]] and [[Lagan]] which started in Spring 2012 and was delivered in 2014<ref>[https://laganscg.com/news/lagan-construction-is-awarded-50-million-energy-from-waste-contract-in-cardiff Lagan Website]</ref> at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Projects Website]</ref> £206m capital cost.
The plant comprises 2 lines via standard combustion technology generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]].
The plant comprises 2 lines via standard combustion technology Martin reverse acting grate, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]].


==Local Authority Users==
==Local Authority Users==