Peterborough EfW: Difference between revisions
m minor text changes |
m expanded text |
||
| Line 1: | Line 1: | ||
[[File:Viridor Peterborough.png| | [[File:Viridor Peterborough.png|350px|left]] | ||
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]] | [[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]] | ||
{{EfWTemplate|EPR=NP3638ZS|id=40}} | {{EfWTemplate|EPR=NP3638ZS|id=40}} | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional combustion technology which is considered an [[ERF]] as a result of having [[R1]] status. Peterborough has permitted operational capacity of | An [[EfW]] facility based upon conventional combustion technology which is considered an [[ERF]] as a result of having [[R1]] status. Peterborough has permitted operational capacity of 85,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] <ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/peterborough-erf/ Viridor Website]</ref>. | ||
==History== | ==History== | ||
The | The Peterborough facility was built to primarily service residual [[Household Waste]] from [[Peterborough City Council|Peterborough]] under a 30 year [[PPP]] contract. It is located close to Peterborough Power Station in Fengate, and commenced operation in December 2015. | ||
==Plant== | ==Plant== | ||
Built by a JV between [[Interserve]] and [[Babcox & Wilcox Volund A/S]] as a turnkey [[EPC]] contract, which started in | Built by a JV between [[Interserve]] and [[Babcox & Wilcox Volund A/S]] as a turnkey [[EPC]] contract, which started in summer 2013 and was delivered in December 2015 at a reported <ref>[http://haggaiprojects.co.uk/efw-projects/4594784023 Haggai Website]</ref> £74m capital cost. | ||
The plant comprises | The plant comprises 1 line via standard combustion B&W Volund proprietary Dynagrate technology, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability up to 85,000 tonnes per annum and generating 7.25MWe based on [[CV]] of 9MJ/kg <ref>[http://www.volund.dk/Waste_to_Energy/References/Peterborough_UK Volund Website]</ref>. | ||
==Local Authority Users== | ==Local Authority Users== | ||