Millerhill EfW: Difference between revisions

MCWaste (talk | contribs)
No edit summary
Northern Chick (talk | contribs)
→‎Plant: removal of info on IBA.
Line 14: Line 14:
==Plant==
==Plant==
FCC Environment appointed [[Hitachi Zosen Inova]] (HZI) and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility.
FCC Environment appointed [[Hitachi Zosen Inova]] (HZI) and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility.
The thermal treatment process produces approximately 38,750 tonnes of [[Incinerator Bottom Ash]] – a coarse, granular, incombustible by-product of incineration that will be recycled off-site for use in the construction industry<ref name="ref1" />.


==Local Authority Users==
==Local Authority Users==