Millerhill EfW: Difference between revisions
No edit summary |
→Plant: removal of info on IBA. |
||
| Line 14: | Line 14: | ||
==Plant== | ==Plant== | ||
FCC Environment appointed [[Hitachi Zosen Inova]] (HZI) and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility. | FCC Environment appointed [[Hitachi Zosen Inova]] (HZI) and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility. | ||
==Local Authority Users== | ==Local Authority Users== | ||