Javelin Park EfW: Difference between revisions
Picture |
m →Plant |
||
| Line 14: | Line 14: | ||
The facility runs continuously 24/7 with a planned shutdown for around two weeks each year for maintenance. | The facility runs continuously 24/7 with a planned shutdown for around two weeks each year for maintenance. | ||
The contract between Gloucestershire County Council and Urbaser Balfour Beatty for the development and operation of this facility has a | The contract between Gloucestershire County Council and Urbaser Balfour Beatty for the development and operation of this facility has a figure in the region of £500 million. | ||
From this process, there are two solid waste products: Incinerator Bottom Ash (IBA), which is processed to recover metals that have passed through the system and is then graded for recycling on-site, and lime-based residues from the flue gas treatment system, which are taken off site for treatment and disposal<ref name="ref1" />. | From this process, there are two solid waste products: Incinerator Bottom Ash (IBA), which is processed to recover metals that have passed through the system and is then graded for recycling on-site, and lime-based residues from the flue gas treatment system, which are taken off site for treatment and disposal<ref name="ref1" />. | ||
==Local Authority Users== | ==Local Authority Users== | ||