Beddington EfW: Difference between revisions

Northern Chick (talk | contribs)
m →‎Plant: Typo
Northern Chick (talk | contribs)
m →‎Summary: Tonnage change
Line 4: Line 4:


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology which as yet does not have [[R1]] status. Beddington has permitted operational capacity of 300,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/beddington-erf/ Viridor Website]</ref>
An [[EfW]] facility based upon conventional combustion technology which as yet does not have [[R1]] status. Beddington has permitted operational capacity of 303,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/beddington-erf/ Viridor Website]</ref>


==History==
==History==