Baldovie and Dundee EfW: Difference between revisions
Line 3: | Line 3: | ||
==Summary== | ==Summary== | ||
In Nov 2017, MVV entered into a contract with [[Dundee City Council]] and [[Angus Council]] to take over and operate this existing energy from waste facility whilst buiding a new, modern facility next door [[Dundee EfW CHP Facility]].<ref>https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility</ref>. | In Nov 2017, MVV entered into a contract with [[Dundee City Council]] and [[Angus Council]] to take over and operate this existing energy from waste facility whilst buiding a new, modern facility next door ([[Dundee EfW CHP Facility]]).<ref>https://www.mvv.de/en/about-us/group-of-companies/mvv-umwelt/shareholdings/mvv-environment-ltd/baldovie-efw-chp-facility</ref>. | ||
The facility first began operations in 1994 and receives 120,000 tonnes of waste a year collected from Dundee, Angus and Aberdeenshire Council areas. The facility primarily accepts [[Municipal Solid Waste]] and [[Household Waste]] but does allow some [[Commercial Waste]] to be treated. | The facility first began operations in 1994 and receives 120,000 tonnes of waste a year collected from Dundee, Angus and Aberdeenshire Council areas. The facility primarily accepts [[Municipal Solid Waste]] and [[Household Waste]] but does allow some [[Commercial Waste]] to be treated. |
Revision as of 13:41, 6 February 2020
Baldovie and Dundee EfW Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | PPC/A/1003157 |
Operator | MVV Environmental Baldovie Ltd |
Region | Scotland |
Operational Capacity | 260ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 20.00MWe |
Number of Lines | 3 |
Number of Turbines | 2 |
CHP | No |
Technology Approach | EfW |
Funding Type | PFI |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2017 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2018 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2019 | 98303.00 | 0.00 | 0.00 | 0.00 | 98303.00 |
2020 | 0.00 | 0.00 | 0.00 | 98303.00 | 98303.00 |
2021 | 78109.00 | 85090.00 | 0.00 | 0.00 | 163203.00 |
2022 | 73085.00 | 109074.00 | 0.00 | 0.00 | 182165.00 |
2023 | 102458.00 | 85457.00 | 0.00 | 0.00 | 187915.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 0.00 | 0.00% | 0.00 | 0.00% |
2017 | 0.00 | 0.00% | 0.00 | 0.00% |
2018 | 0.00 | 0.00% | 0.00 | 0.00% |
2019 | 14991.00 | 15.25% | 8224.00 | 8.37% |
2020 | 13262.00 | 13.49% | 7053.00 | 7.17% |
2021 | 30039.00 | 18.41% | 9632.00 | 5.90% |
2022 | 33863.00 | 18.59% | 9299.00 | 5.10% |
2023 | 37408.00 | 19.91% | 6465.00 | 3.44% |
Summary
In Nov 2017, MVV entered into a contract with Dundee City Council and Angus Council to take over and operate this existing energy from waste facility whilst buiding a new, modern facility next door (Dundee EfW CHP Facility).[1].
The facility first began operations in 1994 and receives 120,000 tonnes of waste a year collected from Dundee, Angus and Aberdeenshire Council areas. The facility primarily accepts Municipal Solid Waste and Household Waste but does allow some Commercial Waste to be treated.
The plant is due to close when the new facility Dundee EfW CHP Facility becomes fully operational.
History
The EFW plant at Baldovie was for many years the only municipal waste fired EfW plant in mainland Scotland. It suffered a major fire in 2012 and was later refurbished at a cost of £13.5m.[2]
It was previously owned and operated by Dundee Energy Recovery Ltd, a local authority owned company.
Plant
The plant generates 10.5 MWe of electrical output with 8.3 MWe exported to the National Grid.