Parc Adfer EfW: Difference between revisions
Typo |
Typo |
||
| Line 7: | Line 7: | ||
==History== | ==History== | ||
Wheelabrator Technologies was selected as the preferred bidder to build and operate the Parc Adfer EfW in 2014, entering into a 25 year contract as a [[ | Wheelabrator Technologies was selected as the preferred bidder to build and operate the Parc Adfer EfW in 2014, entering into a 25 year contract as a [[Public Private Partnership]] (PPP). Support was given by the Welsh Government as the facility serves the five local authorities that make up the North Wales Residual Waste Treatment Project (NWRWTP). Planning consent was granted by Flintshire County Council in May 2015, and the environmental permit was granted by [[Natural Resources Wales]] in October 2015, leading financial close being reached and construction beginning in December 2016 with the full commercial operations starting December 2019<ref name="ref1" />. | ||
==Plant== | ==Plant== | ||