==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Lancing has permitted operational capacity of 75,000 tonnes per annum, and is owned and operated by [[Enviropower Ltd]], a subsidiary of [[Rabbit Group]]. Delivery of waste is from the adjacent [[Rabbit]] transfer station which prepares the [[Waste Derived Fuel]] for the plant comprising a [[Wood Waste]] /[[Biomass]] rich [[RDF]].


==History==
==History==
The Rabbit facility was opened in 2008 to primarily service residual [[Wood Waste]] from skips and construction sources, with later expansion into a wider specification [[RDF]] produced in the adjacent transfer station and is reported as costing £15m<ref>[https://www.rabbitgroup.co.uk/about_rabbit_group.htm Rabbit Website]</ref>.


==Plant==
==Plant==
The plant comprises standard combustion, on 2 lines of Talbot Grates, generating super-heated steam, generating up to 5MWe.


==Local Authority Users==