Portsmouth ERF (Integra South East): Difference between revisions

MCWaste (talk | contribs)
Text
MCWaste (talk | contribs)
Picture
Line 1: Line 1:
[[File:Portsmouth ERF .jpg|400px|left|Portsmouth ERF. Veolia, 2020.]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{EfWTemplate|EPR=BJ7107IJ|id=24}}
{{EfWTemplate|EPR=BJ7107IJ|id=24}}


==Summary==
==Summary==
Line 10: Line 18:
This facility has been developed and continues to be managed under the 28-year [[Public Private Partnership]] contract with Hampshire county council, Southampton city council and Portsmouth city council<ref name="ref1" />.
This facility has been developed and continues to be managed under the 28-year [[Public Private Partnership]] contract with Hampshire county council, Southampton city council and Portsmouth city council<ref name="ref1" />.


Portsmouth ERF completed construction and commissioning, and became operational in spring 2005, following this, in 2006 the Portsmouth ERF was presented with a Design Award by the Portsmouth Civic Society.The ERF has also gained the prestigious award of the Edmund Hambly Medal from the Institute of Civil Engineering for creative design in an engineering project that makes a substantial contribution to sustainable development<ref name="ref1" />.  
Portsmouth ERF completed construction and commissioning, and became operational in spring 2005, following this, in 2006 the Portsmouth ERF was presented with a Design Award by the Portsmouth Civic Society. The ERF has also gained the prestigious award of the Edmund Hambly Medal from the Institute of Civil Engineering for creative design in an engineering project that makes a substantial contribution to sustainable development<ref name="ref1" />.  


==Plant==
==Plant==