Allerton Waste Recovery Park (EfW): Difference between revisions

Bin52 (talk | contribs)
add page specific text
Bin52 (talk | contribs)
m Update links
Line 10: Line 10:


==Plant==
==Plant==
Built by [[Vinci Environment UK]] (a 50/50 subsidiary of [[Vinci Construction UK]] and [[Vinci Environment]]) under a Design & Build-turnkey contract, construction started in early 2015 and was completed in March 2018 at a reported<ref>[https://www.letsrecycle.com/news/latest-news/ameys-allerton-efw-begins-waste-treatment/ Letsrecycle Article]</ref> GBP £183m capital cost<ref>[https://www.letsrecycle.com/news/latest-news/envirecover-efw-facility-completed/ Letsrecycle Article]</ref>.
Built by [[Vinci Environment UK]] (a 50/50 subsidiary of [[Vinci Construction UK]] and [[Vinci Environment]]) under a Design & Build-turnkey contract, construction started in early 2015 and was completed in March 2018 at a reported<ref>[https://www.letsrecycle.com/news/latest-news/ameys-allerton-efw-begins-waste-treatment/ Letsrecycle Article]</ref> GBP £183m capital cost.
The plant comprises 2 lines of 20 tonnes/hour with a design capacity capable of treating 330,000 tonnes per annum via standard combustion technology, air cooled, Vinci Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] delivering 25 MWe of power<ref>[https://www.vinci.com/commun/communiques.nsf/EE061B4F38B090F1C1257DC7005A27EE/$file/VINCI-Yorkshire_energy_from_waste-En.pdf Vinci Press Release]</ref>.
The plant comprises 2 lines of 20 tonnes/hour with a design capacity capable of treating 330,000 tonnes per annum via standard combustion technology, air cooled, Vinci Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] delivering 25 MWe of power<ref>[https://www.vinci.com/commun/communiques.nsf/EE061B4F38B090F1C1257DC7005A27EE/$file/VINCI-Yorkshire_energy_from_waste-En.pdf Vinci Press Release]</ref>.