Lancing EfW: Difference between revisions
add page specific text |
Arctellion (talk | contribs) No edit summary |
||
Line 13: | Line 13: | ||
==Local Authority Users== | ==Local Authority Users== | ||
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year. | |||
{{#clear_external_data:}} | |||
{{#get_db_data: db=engy | |||
|from=wdfincin|where=epr='XP3030XX'|data=authority=authority,epr=epr,ton=ton}} | |||
{|class="wikitable sortable" | |||
! Authority | |||
! Tonnage {{#for_external_table:<nowiki/> | |||
{{!}}- | |||
{{!}} [[{{{authority}}}]] | |||
{{!}} {{{ton}}} | |||
}} | |||
|} | |||
==References== | ==References== | ||
<references /> | <references /> |
Revision as of 10:52, 23 February 2020
Lancing EfW Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | XP3030XX |
Operator | Enviropower Ltd |
Region | South East |
Operational Capacity | 75ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 5.00MWe |
Number of Lines | 2 |
Number of Turbines | 2 |
CHP | |
Technology Approach | EfW |
Funding Type | Merchant |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 59005.00 | 59005.00 |
2017 | 0.00 | 0.00 | 0.00 | 33280.00 | 33280.00 |
2018 | 0.00 | 0.00 | 0.00 | 57012.00 | 59629.00 |
2019 | 0.00 | 0.00 | 0.00 | 51537.00 | 55021.00 |
2020 | 0.00 | 0.00 | 0.00 | 60315.00 | 64056.00 |
2021 | 0.00 | 0.00 | 0.00 | 64666.00 | 66880.00 |
2022 | 0.00 | 0.00 | 0.00 | 52905.00 | 52905.00 |
2023 | 0.00 | 0.00 | 0.00 | 0.00 | 64158.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 6370.00 | 10.80% | 3580.00 | 6.07% |
2017 | 4601.00 | 13.83% | 1965.00 | 5.90% |
2018 | 12365.00 | 20.74% | 3442.00 | 5.77% |
2019 | 12941.00 | 23.52% | 4300.00 | 7.82% |
2020 | 11713.00 | 18.29% | 4551.00 | 7.10% |
2021 | 12262.00 | 18.33% | 3952.00 | 5.91% |
2022 | 4531.00 | 8.56% | 1823.00 | 3.45% |
2023 | 6248.00 | 9.74% | 2607.00 | 4.06% |
Summary
An EfW facility based upon conventional combustion technology which is not considered an ERF as a result of not having R1 status. Lancing has permitted operational capacity of 75,000 tonnes per annum, and is owned and operated by Enviropower Ltd, a subsidiary of Rabbit Group. Delivery of waste is from the adjacent Rabbit transfer station which prepares the Waste Derived Fuel for the plant comprising a Wood Waste /Biomass rich RDF.
History
The Rabbit facility was opened in 2008 to primarily service residual Wood Waste from skips and construction sources, with later expansion into a wider specification RDF produced in the adjacent transfer station and is reported as costing £15m[1].
Plant
The plant comprises standard combustion, on 2 lines of Talbot Grates, generating super-heated steam, generating up to 5MWe.
Local Authority Users
The following data comes from WasteDataFlow for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.