Residual Waste EFW: Difference between revisions
m minor text changes |
|||
| Line 123: | Line 123: | ||
{{#clear_external_data:}} | {{#clear_external_data:}} | ||
{{#get_db_data: db=engy |from=efwdb |where=status='Under Construction' OR status='Comissioning' |data=site=site,id=id,cap=cap}} | {{#get_db_data: db=engy |from=efwdb |where=status='Under Construction' OR status='Comissioning' |data=site=site,id=id,cap=cap}} | ||
The following list summarizes all [[EfW]] sites that were under construction January 2020, with limited summary information in the table. | The following list summarizes all [[EfW]] sites that were under construction January 2020, with limited summary information in the table and more detailed information by clicking through to the site-specific page . Historically there have been some plants that have not passed from construction to operation due to commissioning issues and are not listed i.e. [[Air Products]]. Several of the plants listed below that are presently in extended commissioning are based on [[Gasification]] technologies, but no comment is made as to whether they will reach full operational capacity. | ||
In addition there are some plants below which are reported as commencing construction, but this only applied to initial works or the construction of adjacent infrastructure, and not the [[EfW]] element of the project. The sites that fall into this category (i.e. the [[EfW]] is not in construction) in the list below include ID numbers 53, 59, 60, 63, 65, and 68. | |||
[[File:Under Construction EfW UK.png|600px|right|Under Construction EfW within the UK.]] | [[File:Under Construction EfW UK.png|600px|right|Under Construction EfW within the UK.]] | ||