Lerwick Energy Recovery Plant (Shetland EfW Plant): Difference between revisions

From Wikiwaste
Northern Chick (talk | contribs)
Northern Chick (talk | contribs)
mNo edit summary
Line 12: Line 12:
==History==
==History==
The facility has been operating successfully in Shetland since 2003/04 burning predominantly [[Household Waste|Household]], [[Commercial Waste|Commercial]] and [[Industrial Waste|Industrial]] wastes.
The facility has been operating successfully in Shetland since 2003/04 burning predominantly [[Household Waste|Household]], [[Commercial Waste|Commercial]] and [[Industrial Waste|Industrial]] wastes.
==Plant==


==Local Authority Users==
==Local Authority Users==

Revision as of 14:00, 12 February 2020


Lerwick Energy Recovery Plant (Shetland EfW Plant)
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence PPC/A/1003141
Operator Shetland Heat Energy & Power (SHEAP)
Region Scotland
Operational Capacity 24ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 7.00MWe
Number of Lines 1
Number of Turbines 1
CHP Yes
Technology Approach EfW
Funding Type Merchant

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 19270.40 0.00 1311.74 0.00 20749.00
2020 22575.72 0.00 107.46 0.00 22786.02
2021 18886.28 0.00 58.36 0.00 19054.76
2022 22792.58 0.00 108.22 0.00 23065.86
2023 22762.00 0.00 82.00 0.00 22967.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%
2020 0.00 0.00% 0.00 0.00%
2021 0.00 0.00% 0.00 0.00%
2022 0.00 0.00% 0.00 0.00%
2023 0.00 0.00% 0.00 0.00%

Shetland EfW Plant
Shetland EfW Plant

Summary

The Energy Recovery Plant in Lerwick burns over 23,000 tonnes of waste per year and generates 7MW of energy providing heat and hot water for the Lerwick District Heating System which is operated by the Shetland Heat Energy and Power Ltd (SHEAP)[1] [2].

The waste to feed the plant originates from Shetland, Orkney and areas of the Highlands.

The hot water created from the destruction of the residual waste is used to heat approximately 1,230 domestic properties, commercial and public buildings around Lerwick including schools, care homes, the leisure centre and hospital[3] and distributed around the town via insulated pipes.

History

The facility has been operating successfully in Shetland since 2003/04 burning predominantly Household, Commercial and Industrial wastes.

Plant

Local Authority Users

References