==Summary==
==Summary==
An [[EfW]] facility based upon [[Gasification]] technology and presently in advanced construction/commissioning. Energy Works has forecast operational capacity of 240,000 tonnes per annum, and is being developed by [[Bioenergy Investment Group]].


==History==
==Technology==
The plant is a single line, fluidised bed Gasification plant by [[Outotec]], generating super-heated steam.


==Plant==
==Construction==
The plant commenced construction in January 2016 under a turnkey [[EPC]] contract with [[MW High Tech Projects UK]]. As a result of ongoing delays, the developer terminated the contract and contracted [[Black and Veatch]] to complete the works, which are now understood to be in advanced commissioning<ref>[https://www.letsrecycle.com/news/latest-news/hull-gasification-project-appoints-new-contractor/ Letsrecycle Article]</ref>.


==Waste Input==
==Waste Input==
The plant is designed to run on [[RDF]] manufactured from residual [[Household Waste]] and [[Commercial Waste]], with some preparation on site. The majority of supply has been underpinned by a contract with [[Geminor]] who will aggregate tonnage, including that from [[Hull City Council]]<ref>[https://www.letsrecycle.com/news/latest-news/geminor-major-contract-hull-council/ Letsrecycle Article]</ref>.