==Construction==
==Construction==
The plant commenced construction in January 2016 under a turnkey [[EPC]] contract with [[MW High Tech Projects UK]]. As a result of ongoing delays, the developer terminated the contract and contracted [[Black and Veatch]] to complete the works, which are now understood to be in advanced commissioning<ref>[https://www.letsrecycle.com/news/latest-news/hull-gasification-project-appoints-new-contractor/ Letsrecycle Article]</ref>.  
The plant commenced construction in January 2016 under a turnkey [[EPC]] contract with [[MW High Tech Projects UK]]. As a result of ongoing delays, the developer terminated the contract and contracted [[Black and Veatch]] in April 2019 to complete the works, which are now understood to be in advanced commissioning<ref>[https://www.letsrecycle.com/news/latest-news/hull-gasification-project-appoints-new-contractor/ Letsrecycle Article]</ref>.  


==Waste Input==
==Waste Input==

Revision as of 09:50, 16 February 2020

Energy Works (HULL)
Energy Works (HULL)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An EfW facility based upon Gasification technology and presently in advanced construction/commissioning. Energy Works has forecast operational capacity of 240,000 tonnes per annum, and is being developed by Bioenergy Investment Group.

Technology

The plant is a single line, fluidised bed Gasification plant by Outotec, generating super-heated steam.

Construction

The plant commenced construction in January 2016 under a turnkey EPC contract with MW High Tech Projects UK. As a result of ongoing delays, the developer terminated the contract and contracted Black and Veatch in April 2019 to complete the works, which are now understood to be in advanced commissioning[1].

Waste Input

The plant is designed to run on RDF manufactured from residual Household Waste and Commercial Waste, with some preparation on site. The majority of supply has been underpinned by a contract with Geminor who will aggregate tonnage, including that from Hull City Council[2].