North Quay ERF (Newhaven): Difference between revisions
add page specific text |
Arctellion (talk | contribs) No edit summary |
||
Line 14: | Line 14: | ||
==Local Authority Users== | ==Local Authority Users== | ||
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year. | |||
{{#clear_external_data:}} | |||
{{#get_db_data: db=engy | |||
|from=wdfincin|where=epr='BV8067IL'|data=authority=authority,epr=epr,ton=ton}} | |||
{|class="wikitable sortable" | |||
! Authority | |||
! Tonnage {{#for_external_table:<nowiki/> | |||
{{!}}- | |||
{{!}} [[{{{authority}}}]] | |||
{{!}} {{{ton}}} | |||
}} | |||
|} | |||
==References== | ==References== | ||
<references /> | <references /> |