Leeds Recycling & ERF (Cross Green ERF): Difference between revisions

Northern Chick (talk | contribs)
Arctellion (talk | contribs)
No edit summary
Line 3: Line 3:
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{EfWTemplate|EPR=GP3334CX|id=28}}
{{EfWTemplate|EPR=GP3334CX|id=28}}


==Summary==
==Summary==
Line 19: Line 18:


The architectural design of this ERF was of key consideration during the development process, an internationally renowned architect designed the building that is based upon the use of glass and timber framing. The design includes a green ‘living’ wall with habitat creation to the southern side and rainwater harvesting and sustainable drainage systems. The main building stands at a height of 42 m, with a stack height of 75 m<ref name="ref1" />.
The architectural design of this ERF was of key consideration during the development process, an internationally renowned architect designed the building that is based upon the use of glass and timber framing. The design includes a green ‘living’ wall with habitat creation to the southern side and rainwater harvesting and sustainable drainage systems. The main building stands at a height of 42 m, with a stack height of 75 m<ref name="ref1" />.


==Local Authority Users==
==Local Authority Users==
 
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='GP3334CX'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}
==References==
==References==
<references />
<references />