NESS Energy Project: Difference between revisions

MCWaste (talk | contribs)
No edit summary
MCWaste (talk | contribs)
No edit summary
Line 2: Line 2:
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{EfWTemplate|EPR=Tbc#26|id=151}}
{{EfWTemplate|EPR=Tbc#26|id=151}}


==Summary==
==Summary==
Line 12: Line 19:


==Construction==
==Construction==
The construction firm Acconia is building the plant as the EPC contractor<ref name="ref1" />.
The construction firm Acconia is building the plant as the EPC contractor, having started construction in 2019<ref name="ref1" />.


==Waste Input==
==Waste Input==
The facility will use a feedstock of non-recyclable waste sourced from the local area<ref name="ref1" />.  
The facility will use a feedstock of household residual waste sourced from Aberdeen city, Moray and Aberdeenshire councils<ref name="ref1" />.  


==References==
==References==
<references />
<references />