Canford: Difference between revisions

Imported from text file
 
Bin52 (talk | contribs)
add page specific text
Line 1: Line 1:
[[File:Canford.png|360px|left|Artist Impression of Canford Gasifiaction Facility]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
{{EfWTemplate|EPR=Tbc#16|id=63}}
{{EfWTemplate|EPR=Tbc#16|id=63}}


==Summary==
==Summary==
An [[EfW]] facility based upon [[Gasification]] technology. Originally owned and developed by [[New Earth Solutions]] as part of a wider development at the Canford site in Dorset, it was granted planning consent in 2013 and was intended to be operational by 2015, generating 10MWe. The adjacent [[MBT]] plant is operational and so this plant has been classified as under construction, but no construction is understood to have progressed on the site.


==History==
==Technology==
The plant was designed based on the [[New Earth Solutions Technology]] or [[NEST]] that was utilized in Avonmouth but was mothballed after operational difficulties and with the business going into administration in 2016<ref>[https://www.letsrecycle.com/news/latest-news/breakdown-of-talks-lands-new-earth-in-administration/ Letsreccyel Article]</ref>.


==Plant==
==Construction==
There is no information on the current status of funding or construction of the project in the public domain. 


==Local Authority Users==
==Waste Input==
The plant was designed to run on 80,000 tonnes per annum of prepared [[RDF]] from the adjacent [[MBT]] facility<ref>[https://www.letsrecycle.com/news/latest-news/new-earth-solutions-to-build-dorset-efw-plant/ Letsrecycle Article]</ref>.


==References==
==References==
<references />
<references />