Swindon Energy Plant: Difference between revisions

From Wikiwaste
Imported from text file
 
Bin52 (talk | contribs)
add page specific text
Line 3: Line 3:


==Summary==
==Summary==
An [[EfW]] facility originally based upon [[Gasification]] technology. Consented on [[Crapper and Sons]] [[Landfill]] site in Wootton Basset, as part of a number of other facilities including a [[Biomass]] project from [[Waste Wood]] and a [[Mechanical Treatment]] process. The initial works were reported as commenced, but no construction is understood to have progressed on the site of the [[EfW]] facility to date.


==History==
==Technology==
The plant was originally designed based on modular [[Gasification]] technology. 


==Plant==
==Construction==
There is no information on the current status of funding or construction of the project in the public domain, the company website notes that planning is in place in 2016 but has no other detail<ref>[https://www.crapperandsons.co.uk/renewable-energy-plant/ Crapper and Sons Website]</ref>. 


==Local Authority Users==
==Waste Input==
The plant was designed to run on 70,000 tonnes per annum of prepared [[RDF]] from an adjacent [[Mechanical Treatment]] facility.


==References==
==References==
<references />
<references />

Revision as of 12:37, 22 February 2020


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An EfW facility originally based upon Gasification technology. Consented on Crapper and Sons Landfill site in Wootton Basset, as part of a number of other facilities including a Biomass project from Waste Wood and a Mechanical Treatment process. The initial works were reported as commenced, but no construction is understood to have progressed on the site of the EfW facility to date.

Technology

The plant was originally designed based on modular Gasification technology.

Construction

There is no information on the current status of funding or construction of the project in the public domain, the company website notes that planning is in place in 2016 but has no other detail[1].

Waste Input

The plant was designed to run on 70,000 tonnes per annum of prepared RDF from an adjacent Mechanical Treatment facility.

References