Newlincs EfW: Difference between revisions
m Update links |
Arctellion (talk | contribs) No edit summary |
||
Line 14: | Line 14: | ||
==Local Authority Users== | ==Local Authority Users== | ||
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year. | |||
{{#clear_external_data:}} | |||
{{#get_db_data: db=engy | |||
|from=wdfincin|where=epr='BT4249IB'|data=authority=authority,epr=epr,ton=ton}} | |||
{|class="wikitable sortable" | |||
! Authority | |||
! Tonnage {{#for_external_table:<nowiki/> | |||
{{!}}- | |||
{{!}} [[{{{authority}}}]] | |||
{{!}} {{{ton}}} | |||
}} | |||
|} | |||
==References== | ==References== | ||
<references /> | <references /> |
Revision as of 10:55, 23 February 2020
Newlincs EfW Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | BT4249IB |
Operator | Newlincs Developments, TIRU |
Region | Yorkshire and the Humber |
Operational Capacity | 56ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 3.20MWe |
Number of Lines | 1 |
Number of Turbines | 1 |
CHP | Yes |
Technology Approach | EfW |
Funding Type | PPP |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 54855.00 | 0.00 | 0.00 | 0.00 | 54855.00 |
2017 | 54363.00 | 0.00 | 0.00 | 0.00 | 54363.00 |
2018 | 42967.00 | 8513.00 | 0.00 | 0.00 | 51480.00 |
2019 | 44508.00 | 6755.00 | 0.00 | 0.00 | 51263.00 |
2020 | 53004.00 | 1163.00 | 0.00 | 0.00 | 54167.00 |
2021 | 49039.00 | 2282.00 | 0.00 | 0.00 | 51321.00 |
2022 | 47868.00 | 3381.00 | 0.00 | 0.00 | 51249.00 |
2023 | 50197.00 | 5504.00 | 0.00 | 0.00 | 55701.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 9396.00 | 17.13% | 2690.00 | 4.90% |
2017 | 9023.00 | 16.60% | 2500.00 | 4.60% |
2018 | 8019.00 | 15.58% | 2250.00 | 4.37% |
2019 | 8017.00 | 15.64% | 2355.00 | 4.59% |
2020 | 8832.00 | 16.31% | 2403.00 | 4.44% |
2021 | 8359.00 | 16.29% | 2069.00 | 4.03% |
2022 | 7760.00 | 15.14% | 1770.00 | 3.45% |
2023 | 8280.00 | 14.87% | 2185.00 | 3.92% |
Summary
An EfW facility based upon conventional combustion technology and not considered an ERF as yet based upon it not having R1 status. Newlincs has permitted operational capacity of 60,000 tonnes per annum, owned and operated by Cyclerval-UK. Delivery of waste is by road and the facility processes primarily residual Household Waste.
History
The Newlincs facility was built primarily to service a 25 year PPP contract signed in 1999 with North East Lincolnshire Council, with anticipated total throughput of up to 56,000 tonnes per annum[1]. The site is located between Grimsby and Immingham.
Plant
Built by TIRU SA (now part of Dalkia[2], part of the EDF Group) under a Design & Build EPC-turnkey contract which was delivered and operational in 2003 it is similar to the Exeter. The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual Household Waste. Power output design is reported is 4MWe for Exeter, but electrical capacity is shown as 3.2MWe, consistent with other reported figures.
Local Authority Users
The following data comes from WasteDataFlow for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
Authority | Tonnage |
---|---|
North East Lincolnshire Council | 41572.300 |
North Lincolnshire Council | 6168.100 |