Charlton Lane Eco Park (ACT): Difference between revisions
add page specific text |
m →Summary: typo |
||
| Line 4: | Line 4: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon [[Gasification]] technology with [[AD]], a [[MRF]] bulking facility and an [[HWRC]] on the same site. The Charlton Lane site (also known as Surrey Eco Park) has forecast operational capacity of 60,000 tonnes per annum for the [[Gasification]] alone (with | An [[EfW]] facility based upon [[Gasification]] technology with [[AD]], a [[MRF]] bulking facility and an [[HWRC]] on the same site. The Charlton Lane site (also known as Surrey Eco Park) has forecast operational capacity of 60,000 tonnes per annum for the [[Gasification]] alone (with around 40,000 tonnes per annum in the [[AD]] plant). It was reported that the first waste for hot commissioning was accepted in late 2019 with the [[Gasification]] facility now entering final stages of commissioning<ref>[https://www.ecoparksurrey.uk/news/updates/november-to-december-2019-local-stakeholder-update EcoPark Surrey Website]</ref>. | ||
==Technology== | ==Technology== | ||