Levenseat EfW: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
add page specific text
Arctellion (talk | contribs)
No edit summary
Line 1: Line 1:
[[File:Levenseat.png|400px|left|Aerial Picture of Leveseat in May 2018 - Letsrecycle Article ]]
[[File:Levenseat.png|400px|left|Aerial Picture of Leveseat in May 2018 - Letsrecycle Article ]]
[[Category:EfW Plants]][[Category:Tonnage & Waste Types]][[Category:Technologies & Solutions]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=Tbc#11|id=57}}
{{EfWTemplate|EPR=Tbc#11|id=57}}



Revision as of 11:28, 28 February 2020

Aerial Picture of Leveseat in May 2018 - Letsrecycle Article
Aerial Picture of Leveseat in May 2018 - Letsrecycle Article


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

An EfW facility based upon Gasification technology. The Levenseat facility had forecast operational capacity of 400,000 tonnes per annum, but in June 2019 this was reported as being consented to increase to 750,000 tonnes per annum, incorporating an earlier consent to increase the ATT plant to receive 500,000 tonnes per annum by 2023. Levenseat Renewable Energy Limited is an offshoot of Levenseat Ltd and had investment from Green Investment Bank, Foresight Group and Zouk Capital and debt from Investec Bank when it reached financial close in March 2015 for GBP£111m[1][2].

Technology

The plant is a single line, fluidised bed Gasification plant by Outotec, generating super-heated steam[3]. The capacity of 250,000 tonnes per annum is to be doubled with the installation of a second line/plant.

Construction

The plant commenced construction in 2015 under a turnkey EPC contract with MW High Tech Projects UK. The current EfW plant is not reported as fully commissioned and operational as yet.

Waste Input

The plant is designed to run on RDF manufactured from residual Household Waste and Commercial Waste, with preparation on site in an adjacent, larger scale MRF.