Template:BiomassPlant: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
Line 21: | Line 21: | ||
|- | |- | ||
|[[CfD]] | |[[CfD]] | ||
|{{#external_value: | |{{#external_value:cfdcap}} | ||
|- | |- | ||
|[[CHP]] | |[[CHP]] |
Revision as of 12:19, 2 April 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
[[File:biomass_{{{id}}}.png|400px|center|Site Location]]
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Main Feedstock | Error: no local variable "mainfeed" has been set. |
ROC | Error: no local variable "rocband" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Summary site information collated from a variety of sources
including: Monksleigh[1], Tolvik[2], EA, WasteDataFlow,
SEPA, NRW, DEFRA, BEIS and owner and developer websites