A [[Biomass Waste EFW]] facility permitted to incinerate up to 35,000 tonnes per annum of [[Wood Waste]] generating 3.0MWe to the grid. | A [[Biomass Waste EFW]] facility permitted to incinerate up to 35,000 tonnes per annum of [[Wood Waste]] generating 3.0MWe to the grid. | ||
The Trackwork site was developed by [[Trackwork Ltd]] to process used railway sleepers | The Trackwork site was developed by [[Trackwork Ltd]] to process used railway sleepers from the rail network. Due to the hazardous nature of this particular material, the site is permitted as a hazardous waste incinerator. The permit was consolidated with an adjacent transfer station and processing site in November 2010, the consolidated permit allows up to 12,500 tonnes per year on non-hazardous and 42,000 tonnes per year of material to be handled. | ||
==Plant== | ==Plant== | ||