Trackwork Waste and Thermal Treatment Facility: Difference between revisions

Bin52 (talk | contribs)
m add page specific text
Northern Chick (talk | contribs)
Line 11: Line 11:
A [[Biomass Waste EFW]] facility permitted to incinerate up to 35,000 tonnes per annum of [[Wood Waste]] generating 3.0MWe to the grid.
A [[Biomass Waste EFW]] facility permitted to incinerate up to 35,000 tonnes per annum of [[Wood Waste]] generating 3.0MWe to the grid.


The Trackwork site was developed by [[Trackwork Ltd]] to process used railway sleepers and, due to their hazardous nature, the site is permitted as a hazardous waste incinerator. The permit was consolidated with an adjacent transfer station and processing site in November 2010, the consolidated permit allows up to 12,500 tonnes per year on non-hazardous and 42,000 tonnes per year of material to be handled.  
The Trackwork site was developed by [[Trackwork Ltd]] to process used railway sleepers from the rail network. Due to the hazardous nature of this particular material, the site is permitted as a hazardous waste incinerator. The permit was consolidated with an adjacent transfer station and processing site in November 2010, the consolidated permit allows up to 12,500 tonnes per year on non-hazardous and 42,000 tonnes per year of material to be handled.


==Plant==
==Plant==