Goosey Lodge Power Plant: Difference between revisions
→Plant: typo |
|||
Line 2: | Line 2: | ||
{{BiomassPlant|NAME=Goosey Lodge|id=38}} | {{BiomassPlant|NAME=Goosey Lodge|id=38}} | ||
==Summary== | ==Summary== | ||
Goosey Lodge is a biomass waste EfW generating 16MWe to the grid. It is located in Wymington near Rushton in Northamptonshire. | |||
==Plant== | ==Plant== |
Revision as of 20:16, 8 April 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
Goosey Lodge is a biomass waste EfW generating 16MWe to the grid. It is located in Wymington near Rushton in Northamptonshire.
Plant
Goosey Lodge biomass facility utilises a fluidised bed combustor system which ensures that any liquids and sludges with high Biological or Chemical Oxygen Demands (BOD and COD respectively) can be oxidised efficiently[1].
Goosey Lodge Power Plant was designed and built by Wykes Engineering, the group's Engineering Company. Wkes provided a turnkey solution to the project which included design to manufacture and full life cycle maintenance and project management[1].