Markley Group Biomass: Difference between revisions
New text |
→Summary: additional text |
||
Line 7: | Line 7: | ||
A biomass EFW located at Markey Group premises in Hardwicke, Gloucestershire which generates 2.1MW from c. 2,300 tonnes of waste wood from its commercial business<ref name="BIO">[https://www.bioenergy-news.com/news/markey-group-opens-1-1m-biomass-facility/ Bioenergy News]</ref>. | A biomass EFW located at Markey Group premises in Hardwicke, Gloucestershire which generates 2.1MW from c. 2,300 tonnes of waste wood from its commercial business<ref name="BIO">[https://www.bioenergy-news.com/news/markey-group-opens-1-1m-biomass-facility/ Bioenergy News]</ref>. | ||
In 2012, Gloucester based Markey Group opened a £1.1m biomass facility which runs on waste wood generated by the subsidiary of Markey Group, Premiere Kitchens<ref name="BIO" />. Each year Premiere Kitchens creates approximately 2,350 tonnes of waste wood in the form of extracted chipboard dust and residual off-cuts, which is used in the plant to generate all of the heating and hot water required for the company's site at | In 2012, Gloucester based Markey Group opened a £1.1m biomass facility which runs on waste wood generated by the subsidiary of Markey Group, Premiere Kitchens<ref name="BIO" />. Each year Premiere Kitchens creates approximately 2,350 tonnes of waste wood in the form of extracted chipboard dust and residual off-cuts, which is used in the plant to generate all of the heating and hot water required for the company's site at Hardwicke<ref name="BIO" />. | ||
Following the installation of the biomass facility, Markey Group were able to remove its mains gas supply and as a result the company reduces its carbon emissions by more than c.1,200 tonnes per year<ref name="BIO" />. | |||
==Plant== | ==Plant== |
Revision as of 13:15, 16 April 2020
Markley Group Biomass Operational | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Markley Group (Premiere Kitchens) |
Capacity | 2.1 MWe |
Feedstock | Waste Wood |
EPR (Waste Licence) | |
ROC | No |
CfD | |
CHP | Unkwn |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A biomass EFW located at Markey Group premises in Hardwicke, Gloucestershire which generates 2.1MW from c. 2,300 tonnes of waste wood from its commercial business[1].
In 2012, Gloucester based Markey Group opened a £1.1m biomass facility which runs on waste wood generated by the subsidiary of Markey Group, Premiere Kitchens[1]. Each year Premiere Kitchens creates approximately 2,350 tonnes of waste wood in the form of extracted chipboard dust and residual off-cuts, which is used in the plant to generate all of the heating and hot water required for the company's site at Hardwicke[1].
Following the installation of the biomass facility, Markey Group were able to remove its mains gas supply and as a result the company reduces its carbon emissions by more than c.1,200 tonnes per year[1].
Plant
The plant was commissioned by UK-based Indusvent Limited; the system features a 2.1 MW hot water boiler manufactured by Danish based Justsen Energiteknik A/S[1]. the burning of the waste wood in the boiler is controlled automatically to maximise efficiency with results monitored both on site and at the manufacturers premises in Denmark[1].