Markley Group Biomass: Difference between revisions
Additon of a different picture. |
|||
| Line 1: | Line 1: | ||
[[Category:Biomass EfW Plants]] | [[Category:Biomass EfW Plants]] | ||
{{BiomassPlant|NAME=Markley Group Biomass|id=58}} | {{BiomassPlant|NAME=Markley Group Biomass|id=58}} | ||
[[File: | [[File:Premiere Kitchens Biomass Facility.jpg|300px|left|Premiere Kitchens Biomass Facility]] | ||
<br clear="left"/> | <br clear="left"/> | ||
Revision as of 13:21, 16 April 2020
| Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
| Operator | Error: no local variable "operator" has been set. |
| Capacity | Error: no local variable "capacity" has been set. MWe |
| Feedstock | Error: no local variable "mainfeed" has been set. |
| EPR (Waste Licence) | Error: no local variable "epr" has been set. |
| ROC | Error: no local variable "roc" has been set. |
| CfD | Error: no local variable "cfdcap" has been set. |
| CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
| Year | Wood | Litter | RDF | Other | Total |
|---|
Output Data
| Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
|---|

Summary
A biomass EFW located at Markey Group premises in Hardwicke, Gloucestershire which generates 2.1MW from c. 2,300 tonnes of waste wood from its commercial business[1].
In 2012, Gloucester based Markey Group opened a £1.1m biomass facility which runs on waste wood generated by the subsidiary of Markey Group, Premiere Kitchens[1]. Each year Premiere Kitchens creates approximately 2,350 tonnes of waste wood in the form of extracted chipboard dust and residual off-cuts, which is used in the plant to generate all of the heating and hot water required for the company's site at Hardwicke[1].
Following the installation of the biomass facility, Markey Group were able to remove its mains gas supply and as a result the company reduces its carbon emissions by more than c.1,200 tonnes per year[1].
Plant
The plant was commissioned by UK-based Indusvent Limited; the system features a 2.1 MW hot water boiler manufactured by Danish based Justsen Energiteknik A/S[1]. The burning of the waste wood in the boiler is controlled automatically to maximise efficiency with results monitored both on site and at the manufacturers premises in Denmark[1].
Local Authority Users
As this is a private biomass boiler served only by offcuts from the commercial organisation it serves, there are no local authority users.
