Lancing Biomass Plant: Difference between revisions
Created page with "Category:Biomass EfW Plants {{BiomassPlant|NAME=Lancing Biomass Plant|id=48}} ==Summary== A Biomass EfW facility based on 40,000 tonnes per annum of waste wood produc..." |
No edit summary |
||
| Line 3: | Line 3: | ||
==Summary== | ==Summary== | ||
A [[Biomass EfW]] facility based on 40,000 tonnes per annum of waste wood | A [[Biomass EfW]] facility based on consuming 40,000 tonnes per annum of mainly waste wood feedstock to produce 5 MW of electricity to be exported to the national grid. The facility is located in Lancing in West Sussex. The feedstock that is accepted at the facility includes wood, paper and organic-based construction and demolition waste<ref name="ref1">Lets Recycle, 2007. [https://www.letsrecycle.com/news/latest-news/plans-unveiled-for-10m-biomass-plant-in-sussex/ Plans Unveiled For 10M Biomass Plant In Sussex - Letsrecycle.Com. Online. letsrecycle.com. [Accessed 16 April 2020].]</ref>. | ||
The Lancing biomass plant began construction in 2007 and became operational in 2008. The facility is operated and was developed by Rabbit Waste Management Ltd<ref name="ref2">Rabbit Group, 2020. [https://www.rabbitgroup.co.uk/energy-from-waste.htm Energy From Waste Facility For Green Waste Disposal & Recycling UK. Online. Rabbitgroup.co.uk. [Accessed 16 April 2020].]</ref> | The Lancing biomass plant began construction in 2007 and became operational in 2008. The facility is operated and was developed by Rabbit Waste Management Ltd<ref name="ref2">Rabbit Group, 2020. [https://www.rabbitgroup.co.uk/energy-from-waste.htm Energy From Waste Facility For Green Waste Disposal & Recycling UK. Online. Rabbitgroup.co.uk. [Accessed 16 April 2020].]</ref>. | ||
==Plant== | ==Plant== | ||
Revision as of 13:33, 17 April 2020
| Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
| Operator | Error: no local variable "operator" has been set. |
| Capacity | Error: no local variable "capacity" has been set. MWe |
| Feedstock | Error: no local variable "mainfeed" has been set. |
| EPR (Waste Licence) | Error: no local variable "epr" has been set. |
| ROC | Error: no local variable "roc" has been set. |
| CfD | Error: no local variable "cfdcap" has been set. |
| CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
| Year | Wood | Litter | RDF | Other | Total |
|---|
Output Data
| Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
|---|
Summary
A Biomass EfW facility based on consuming 40,000 tonnes per annum of mainly waste wood feedstock to produce 5 MW of electricity to be exported to the national grid. The facility is located in Lancing in West Sussex. The feedstock that is accepted at the facility includes wood, paper and organic-based construction and demolition waste[1].
The Lancing biomass plant began construction in 2007 and became operational in 2008. The facility is operated and was developed by Rabbit Waste Management Ltd[2].
Plant
The facility cost £10m to develop[1] and is collocated with recycling operations[2].
