Margam Green Energy Plant: Difference between revisions

From Wikiwaste
Northern Chick (talk | contribs)
→‎Summary: additional text
Northern Chick (talk | contribs)
Line 14: Line 14:


==Plant==
==Plant==
The main EPC contractor was the consortium of Babcock Wilcox VØlund a/s (BWV) and Interserve Construction Ltd. VØlund is part of the Babcock & Wilcox Group, and provided the process equipment whilst Interserve (Wales) undertook the civil engineering and building.  BWV now has responsibility for the plant’s operations and maintenance<ref name="Marg" />.
The main EPC contractor was the consortium of Babcock Wilcox VØlund a/s (BWV) and Interserve Construction Ltd. VØlund is part of the Babcock & Wilcox Group, and provided the process equipment whilst Interserve (Wales) undertook the civil engineering and building.  BWV now has responsibility for the plant’s operations and maintenance<ref name="Marg" /> for the next 15 years<ref name="BWV"[http://www.volund.dk/Biomass_energy/References/Margam/ B&W Volund]</ref>.


==Local Authority Users==
==Local Authority Users==


==References==
==References==

Revision as of 13:38, 24 April 2020


Magram Green Enegry Plant
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Margam Green Energy Ltd
Capacity 40 MWe
Feedstock Waste Wood
EPR (Waste Licence) DP3137EG
ROC No
CfD
CHP Unkwn

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Margam Green Energy Plant
Margam Green Energy Plant


Summary

A Biomass Waste EFW located near Port Talbot, South Wales, generating c. 40 MW[1].

The plant is owned by Glennmont Partners, a specialist clean energy investment fund which focuses on investment in clean energy infrastructure. Originally the Margam project was a joint venture between Cardiff based energy development company, Eco2 Ltd and a local company, Western Logs Group. Eco2 Ltd now has responsibility for the plants overall operations and fuel management supply[1]. The project was one of the final of its type to be supported under the Renewables Obligation [2].

The plant became operational in 2019 at a cost of c.£160m[1].

The Margam plant takes waste wood that is supplied by Stobart Biomass on a long term contract. The waste wood is sourced and supplied by Stobart from across the country at a rate of approximately 6,000 tonnes per week (c.300,000 tonnes per annum)[1].

Plant

The main EPC contractor was the consortium of Babcock Wilcox VØlund a/s (BWV) and Interserve Construction Ltd. VØlund is part of the Babcock & Wilcox Group, and provided the process equipment whilst Interserve (Wales) undertook the civil engineering and building. BWV now has responsibility for the plant’s operations and maintenance[1] for the next 15 years<ref name="BWV"B&W Volund</ref>.

Local Authority Users

References