Chilton Power Station: Difference between revisions
m minor text changes |
m tonnage data added |
||
Line 5: | Line 5: | ||
==Summary== | ==Summary== | ||
A Biomass Waste EFW facility utilising a feedstock of 120,000 tpa of [[Wood Waste]] to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham | A Biomass Waste EFW facility utilising a feedstock of up to 120,000 tpa of [[Wood Waste]] to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham. | ||
The facility has been developed, built and continues to be operated by | The facility has been developed, built and continues to be operated by [[Dalkia]], a sister company to [[Veolia Environmental Services]]. Construction started in early 2010 and it became operational in 2011<ref name="ref1 />. | ||
==Plant== | ==Plant== | ||
The facility cost £40 million to develop<ref name="ref1" />. | The facility cost £40 million to develop<ref name="ref1" />. | ||
==Tonnage Input/Fuel== | |||
The tonnage received by the plant in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> was reported by [[Ofgem]] as follows: | |||
{| class="wikitable" | |||
|- | |||
! Biomass !! Tonnage (2018-19) | |||
|- | |||
| [[Wood Waste]] || '''115,099''' | |||
|- | |||
| Other || 0 | |||
|- | |||
| Total||115,099 | |||
|} | |||
The [[Wood Waste]] is received from a variety of sources including old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from [[Waste Disposal Authority]]'s civic amenity sites<ref name="ref1" >Lets Recycle, 2011. [https://www.letsrecycle.com/news/latest-news/dalkias-40m-biomass-plant-nears-completion/ Dalkias 40M Biomass Plant Nears Completion - Letsrecycle.Com. Online. letsrecycle.com.[Accessed 6 April 2020].]</ref>. The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and was '''117,162''' tonnes. | |||
==References== | ==References== | ||
<references/> | <references/> |
Revision as of 06:20, 27 April 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste EFW facility utilising a feedstock of up to 120,000 tpa of Wood Waste to generate 17.5 MWe to be exported to the national grid. The facility is located in the town of Chilton in Durham.
The facility has been developed, built and continues to be operated by Dalkia, a sister company to Veolia Environmental Services. Construction started in early 2010 and it became operational in 2011[2].
Plant
The facility cost £40 million to develop[2].
Tonnage Input/Fuel
The tonnage received by the plant in the most recent Annual Sustainability Report for 2018-19[3] was reported by Ofgem as follows:
Biomass | Tonnage (2018-19) |
---|---|
Wood Waste | 115,099 |
Other | 0 |
Total | 115,099 |
The Wood Waste is received from a variety of sources including old pallets, manufacturing off-cuts, wood from the construction and demolition industry and material from Waste Disposal Authority's civic amenity sites[2]. The Wood Waste tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and was 117,162 tonnes.
References
- ↑ Robinson, P., 2011. Chilton Biomass Energy Centre County Durham. Online. Geograph.org.uk. [Accessed 7 April 2020.]
- ↑ 2.0 2.1 2.2 Lets Recycle, 2011. Dalkias 40M Biomass Plant Nears Completion - Letsrecycle.Com. Online. letsrecycle.com.[Accessed 6 April 2020.]
- ↑ Biomass Sustainability Dataset 2018-19