Holbrook Community REC: Difference between revisions
m tonnage data added |
|||
Line 1: | Line 1: | ||
[[Category:Biomass EfW Plants]] | [[Category:Biomass EfW Plants]] | ||
{{BiomassPlant|NAME=Holbrook Community Renewable Energy Centre|id=40}} | {{BiomassPlant|NAME=Holbrook Community Renewable Energy Centre|id=40}} | ||
[[File:Holbrook Biomass.jpg|400px|left|Holbrook Community Renewable Energy Centre]] | [[File:Holbrook Biomass.jpg|400px|left|Holbrook Community Renewable Energy Centre]]__TOC__ | ||
<br clear='left'/> | |||
==Summary== | ==Summary== | ||
A [[Biomass EfW]] facility based on 55,000 tonnes per annum of | A [[Biomass EfW]] facility based on up to 55,000 tonnes per annum of [[Wood Waste]] producing 6.5 MWe gross power to be exported to the national grid. This facility is a [[Combined Heat and Power]] (CHP) plant, enough heat is produced and harnessed to supply approximately 6,700 local homes and commercial properties. Holbrook Community Renewable Energy Centre is located in Sheffield<ref name="ref1" >Date, 2017. [https://www.letsrecycle.com/news/latest-news/mid-uk-supplies-waste-wood-for-sheffield-biomass-facility/ Mid UK Supplies Waste Wood For Sheffield Biomass Facility. Online. letsrecycle.com. [Accessed 14 April 2020].]</ref>. | ||
The | The [[Wood Waste]] feedstock is locally supplied by [[Mid UK Recycling]]. The operator of this facility is [[Veolia Energy Services Ltd]]<ref name="ref1" />. | ||
==Plant== | ==Plant== | ||
The Design and Build EPC contractor for this development was Kandor Energy Ltd<ref>Kandor Energy, 2020. [https://www.kantorenergy.com/holbrook-community-renewable-energy-centre Kantor Energy - Holbrook Community Renewable Energy Centre. Online. Kantorenergy.com. [Accessed 14 April 2020].]</ref>. | The Design and Build [[EPC]] contractor for this development was [[Kandor Energy Ltd]]<ref>Kandor Energy, 2020. [https://www.kantorenergy.com/holbrook-community-renewable-energy-centre Kantor Energy - Holbrook Community Renewable Energy Centre. Online. Kantorenergy.com. [Accessed 14 April 2020].]</ref>. | ||
The facility cost £30m to develop and became operational in 2017<ref>Recycling and Waste World, 2017. [https://www.recyclingwasteworld.co.uk/business/sheffield-renewable-energy-centre-opts-for-biomass-wood-chip-from-mid-uk-recycling/154126/ Sheffield Renewable Energy Centre Opts For Biomass Wood Chip From Mid UK Recycling. Online Recyclingwasteworld.co.uk. [Accessed 14 April 2020].]</ref> | The facility cost £30m to develop and became operational in 2017<ref>Recycling and Waste World, 2017. [https://www.recyclingwasteworld.co.uk/business/sheffield-renewable-energy-centre-opts-for-biomass-wood-chip-from-mid-uk-recycling/154126/ Sheffield Renewable Energy Centre Opts For Biomass Wood Chip From Mid UK Recycling. Online Recyclingwasteworld.co.uk. [Accessed 14 April 2020].]</ref> | ||
The technology utilised in this facility is two water-cooled moving grate furnaces that are supplied by Turboden Srl (part of the Mitsubishi Heavy Industries Group). Turboden Srl also supplied the | The technology utilised in this facility is two water-cooled moving grate furnaces that are supplied by [[Turboden Srl]] (part of the [[Mitsubishi Heavy Industries Group]]). [[Turboden Srl]] also supplied the ‘[[organic rankin cycle]]’ (ORC) turbogenerators with air condensers for the facility which uses ‘organic fluid’ vapour as the driving force for the turbine within a closed loop heating circuit<ref name="ref1" />. | ||
== | ==Tonnage Input/Fuel== | ||
The tonnage received by the plant is only [[Wood Waste]] [[Biomass]] and in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> [[Ofgem]] reported the following fuel received: | |||
{| class="wikitable" | |||
|- | |||
! Biomass !! Tonnage (2018-19) | |||
|- | |||
| [[Wood Waste]] || '''21,188''' | |||
|- | |||
| Other || 0 | |||
|- | |||
| Total||21,188 | |||
|} | |||
The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and were '''33,821''' tonnes. | |||
==References== | ==References== | ||
<references/> | <references/> |
Revision as of 06:45, 27 April 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass EfW facility based on up to 55,000 tonnes per annum of Wood Waste producing 6.5 MWe gross power to be exported to the national grid. This facility is a Combined Heat and Power (CHP) plant, enough heat is produced and harnessed to supply approximately 6,700 local homes and commercial properties. Holbrook Community Renewable Energy Centre is located in Sheffield[1].
The Wood Waste feedstock is locally supplied by Mid UK Recycling. The operator of this facility is Veolia Energy Services Ltd[1].
Plant
The Design and Build EPC contractor for this development was Kandor Energy Ltd[2].
The facility cost £30m to develop and became operational in 2017[3]
The technology utilised in this facility is two water-cooled moving grate furnaces that are supplied by Turboden Srl (part of the Mitsubishi Heavy Industries Group). Turboden Srl also supplied the ‘organic rankin cycle’ (ORC) turbogenerators with air condensers for the facility which uses ‘organic fluid’ vapour as the driving force for the turbine within a closed loop heating circuit[1].
Tonnage Input/Fuel
The tonnage received by the plant is only Wood Waste Biomass and in the most recent Annual Sustainability Report for 2018-19[4] Ofgem reported the following fuel received:
Biomass | Tonnage (2018-19) |
---|---|
Wood Waste | 21,188 |
Other | 0 |
Total | 21,188 |
The Wood Waste tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and were 33,821 tonnes.
References
- ↑ 1.0 1.1 1.2 Date, 2017. Mid UK Supplies Waste Wood For Sheffield Biomass Facility. Online. letsrecycle.com. [Accessed 14 April 2020.]
- ↑ Kandor Energy, 2020. Kantor Energy - Holbrook Community Renewable Energy Centre. Online. Kantorenergy.com. [Accessed 14 April 2020.]
- ↑ Recycling and Waste World, 2017. Sheffield Renewable Energy Centre Opts For Biomass Wood Chip From Mid UK Recycling. Online Recyclingwasteworld.co.uk. [Accessed 14 April 2020.]
- ↑ Biomass Sustainability Dataset 2018-19