Newport Alexandra Docks: Difference between revisions

No edit summary
MCWaste (talk | contribs)
No edit summary
Line 1: Line 1:
[[Category:EfW Plants]]
[[Category:EfW Plants]]
{{EfWTemplate|EPR=Tbc#31|id=205}}
[[File:Newport Alexandra Docks EfW.png|400px|left|Newport Alexandra Docks EfW. Andusia, 2020.]]


{{EfWTemplate|EPR=Tbc#31|id=205}}


==Summary==
==Summary==
An [[EfW]] facility that reached financial close in early 2020, the facility will accept up to 220,000 tonnes per annum of [[Refuse Derived Fuel]] as feedstock and generate electricity to be exported to the national grid. This facility will be located in Newport, South Wales.<ref name="ref1" >Andusia, 2020. [https://www.andusia.co.uk/wte-plants/newport-efw-plant/ New EfW Plant In Newport. Online. Andusia. [Accessed 27 April 2020].]</ref>.


==History==
This facility will become an essential part of Newport’s waste management plan going into the future<ref name="ref1"/>.


==Technology==
The conventional EfW plant will be implementing proven technology for the incineration process<ref name="ref1"/>


==Plant==
==Construction==
Construction of this facility started early in 2020 and is scheduled to become operational in 2021<ref name="ref1" />.


==Waste Input==
==Waste Input==
The [[Refuse Derived Fuel]] waste feedstock will be supplied by [[Andusia]], as the sole waste supplier of this facility. The 220,000 tpa of RDF will be delivered under a 25-year feedstock supply contract, and will be locally sourced from industrial, commercial and municipal waste arising in South Wales<ref name="ref1" />.


==References==
==References==
<references />
<references />