Newport Alexandra Docks: Difference between revisions
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
[[Category:EfW Plants]] | [[Category:EfW Plants]] | ||
{{EfWTemplate|EPR=Tbc#31|id=205}} | |||
[[File:Newport Alexandra Docks EfW.png|400px|left|Newport Alexandra Docks EfW. Andusia, 2020.]] | |||
==Summary== | ==Summary== | ||
An [[EfW]] facility that reached financial close in early 2020, the facility will accept up to 220,000 tonnes per annum of [[Refuse Derived Fuel]] as feedstock and generate electricity to be exported to the national grid. This facility will be located in Newport, South Wales.<ref name="ref1" >Andusia, 2020. [https://www.andusia.co.uk/wte-plants/newport-efw-plant/ New EfW Plant In Newport. Online. Andusia. [Accessed 27 April 2020].]</ref>. | |||
= | This facility will become an essential part of Newport’s waste management plan going into the future<ref name="ref1"/>. | ||
==Technology== | |||
The conventional EfW plant will be implementing proven technology for the incineration process<ref name="ref1"/> | |||
== | ==Construction== | ||
Construction of this facility started early in 2020 and is scheduled to become operational in 2021<ref name="ref1" />. | |||
==Waste Input== | ==Waste Input== | ||
The [[Refuse Derived Fuel]] waste feedstock will be supplied by [[Andusia]], as the sole waste supplier of this facility. The 220,000 tpa of RDF will be delivered under a 25-year feedstock supply contract, and will be locally sourced from industrial, commercial and municipal waste arising in South Wales<ref name="ref1" />. | |||
==References== | ==References== | ||
<references /> | <references /> | ||