Newport Alexandra Docks: Difference between revisions

MCWaste (talk | contribs)
No edit summary
Bin52 (talk | contribs)
mNo edit summary
Line 16: Line 16:


==Construction==
==Construction==
Construction of this facility started early in 2020 and is scheduled to become operational in 2021<ref name="ref1" />.
Construction of this facility started early in 2020 and is scheduled to become operational in 2023<ref name="ref1" />.


==Waste Input==
==Waste Input==