Riverside Resource Recovery Facility (RRRF): Difference between revisions
Arctellion (talk | contribs) No edit summary |
m Typo |
||
| Line 7: | Line 7: | ||
==History== | ==History== | ||
The Riverside facility was built primarily to service a 30 year [[PPP]] contract signed in 2002 with [[Western Riverside Waste Disposal Authority |WRWA]], with anticipated total throughput of up to 585,000 tonnes per annum - receiving additional residual [[Commercial Waste]] and some [[Household Waste]] from other local authorities, primarily via river-based transfer facilities. It is located on the banks of the River Thames at Belvedere, in Bexley. | The Riverside facility was built primarily to service a 30 year [[PPP]] contract signed in 2002 with [[Western Riverside Waste Disposal Authority |WRWA]], with anticipated total throughput of up to 585,000 tonnes per annum - receiving additional residual [[Commercial Waste]] and some [[Household Waste]] from other local authorities, primarily via river-based transfer facilities. It is located on the banks of the River Thames at Belvedere, in Bexley. In June 2018 [[Cory Riverside Energy]] was sold to a consortium of investors, including [[Dalmore Capital]], [[Fiera Infrastructure]], [[Semperian PPP Investment Partners]] and [[Swiss Life Asset Managers]]<ref>[https://www.letsrecycle.com/news/latest-news/cory-sold-to-consortium-of-investors/ Letsrecycle Article]</ref> with a second plant planned on an adjacent site currently in the planning process<ref>[https://www.letsrecycle.com/news/latest-news/cory-plans-second-london-efw/ Letsrecycle Article]</ref>. | ||
==Plant== | ==Plant== | ||